Topic: | Leisure / LeisureCentres - refurbishment | |
Posted by: | John Todd | |
Date/Time: | 05/02/11 17:26:00 |
When the contract with CIP was due to end in 2006/7 a thorough review was made of LBH Libraries and Leisure Centres. Many were in an unacceptable condition. I recall the sum of £12m being required. With the exception of Chiswick Library the work has now been completed. |