Topic: | Boston Manor Park Canal Footbridge closed. | Forum Home |
Posted by: | Michael Adams | |
Date/Time: | 23/10/21 09:17:00 |
As of this morning Sat 23rd Oct the footbridge at the bottom of Boston Manor Park across the canal is closed, So anyone hoping to walk across the park from Boston Manor Road and continue their walk along the canal will be thwarted *. I'm only posting this because the closure only becomes apparent once you reach the foot of the bridge on either side. Where to add insult to injury you're given the standard *advice* to use another route. (What else would you do ? Remain there in perpetuity/ ) When it would have been nice had someone thought to post notices of the closure at the gates of the Park to save people an unnecessary walk. As it happens all that's wrong with the bridge is that one of the plywood panels that forms the decking has worked loose. A half hour job for a man with a box of screws and a battery powered drill driver. However given the bridge is possibly a shared responsibility between LBE and the relevent Waterways body this probably means a 3 month consultation process followed by a report recommending that four of the plywood panels should be replaced. Now two men with their drill driver and box of screws taking four hours. Instead of which conultation and report total cost £20,000. Follwoed by 3 years of arguing betwen LBE and the Waterways body as to whis going to pay for the four plywood panels the screws and the two mens wages for four hours. * The barriers consist of the standard 4ft brightly coloured plastic jobbies. The cross member across the bottom make them resonably scalable even by a reasonably fit 74 yrs old, Only don't try this at home children michael adams |