| Topic: | Re:Detailed design for Watermans Park to Kew Bridge cycleway | |
| Posted by: | Chris Dakers | |
| Date/Time: | 20/03/23 16:55:00 |
| Six months to build 300 meters of cycle track in Brentford; over a year to repair a bridge over the River Brent, 30 years to build HS2. Productivity in the UK is going backwards. |