Topic: | Re: Church Street - How not to conduct a public consultation | |
Posted by: | Ian Speed | |
Date/Time: | 17/04/17 13:36:00 |
I could have sworn that at the time of the closure, the barrier was promised to be an easily raiseable multi-storey car park type barrier to provide for when the Twickenham Road was blocked, not a huge solid thing like the planter. |