Topic: | Re:Re:Re:high street flooeded | |
Posted by: | Phil Andrews | |
Date/Time: | 03/02/12 17:49:00 |
I was on the eastbound 267 on the A4 this morning at about 8.00 and although one of the westbound lanes was coned off there was no sign of anybody working on it, not a workman anywhere in sight. Indeed I wondered whether kids had put the cones out for a prank. True the working day starts at 9.00 for most people but did somebody say this was emergency work? This evening at about 4.30 I was again on the 267 in the opposite direction and the traffic heading for the A4 at the Half Acre and into Boston Manor Road was at a complete standstill, so much so that I got off the bus and walked on to Isleworth from there. Brentford High Street was closed other than for access but there was still a large volume of traffic using it and exiting right into Commerce Road. Why? Where can anyone get to from there? Does the chaos on BMR mean that the works on the A4 have not been completed in time for the evening rush hour? |