Topic: | Re:Re:Re:Re:high street flooeded | |
Posted by: | Anthony Waller | |
Date/Time: | 02/02/12 00:05:00 |
It's less than 8 years since the entire pipe network over the canal bridge was renewed. With water pressure down throughout Brentford and Osterley since the erection of the TVU building and GSK which is about 9 years now and the amount of floods and delays endured almost contantly for the last 6 years. Every household in Brentford, Osterley and Isleworth should be entitled to a hefty reduction in water rates for at least the next 3 years. After all Thames water are supposed to get fined and sometimes do but where does the fine money actually go? Certainly not to those who have borne the brunt of endless shortcomings. |