Topic: | Re:Re:Re:Re:Re:Re:Re:Re:high street flooeded | |
Posted by: | Adam Beamish | |
Date/Time: | 03/02/12 15:01:00 |
Hi Chris, Thanks for this, as I said at the start of my post I guessed this work couldn't have been called off etc. As Claire has said though I'm not quite sure of the connection between the column at Gillette Corner and the lane closure a long, long way before that junction. Forgive me for shuddering at the mention of complete resurfacing - is this work going to take place during the day, or only a night, or 24/7 ?. Certainly giving me every motivation to run to/from work ;-) Adam |