Topic: | Re:Brentford High St closure | |
Posted by: | Guy Lambert | |
Date/Time: | 07/09/16 23:56:00 |
Latest from H Highways (late this afternoon): "Brentford High Street is expected to reopen tomorrow morning. Thames Water has finished the work on site and reinstated the road surface, however due to the warmer temperature, the new surface will need more time to settle before it is suitable for vehicle overrun" |