Topic: | Re:Re:FAO Cllr. Guy Lambert | |
Posted by: | N V Brooks | |
Date/Time: | 12/12/23 18:13:00 |
It isn't the works in progress per se Guy, it is the sudden change in direction caused by the very wide buffer pavement between the cycle lane and the carriageway. The way that this 'lump' of pavement sticks out catches larger vehicles out. I was there again this afternoon and a Mercedes Sprinter swerved onto the opposite side of the road to avoid the change |