Meanwhile the bottlenecks at the eastern end of the M4; the impasse at the junction of Brentford Hi Street and Kew Bridge Road remains with NO MEANS of ever improving either short of blowing up Kew Bridge and Chiswick roundabout and starting again from scratch - minumum 2 x 3 lane bridges over the Thames (don't even ask what happens to the build up of traffic in Kew itself)- new rail services, lines and stations, the M4 extended to swoop down around the Hogarth Roundabout/Hammersmith flyover with a great sweep off to the North Circular which would also have to be widened to take 3 lanes in each direction. And there's the poor twits in the hat box flats at the Stadium, the Citron site etc etc. Thank God I'll be long gone by the time all that happens. |