Topic: | Re:Re:Re:What happening with land between M4 and canals | |
Posted by: | Adam Beamish | |
Date/Time: | 08/01/19 11:25:00 |
It sounds to me that the amount of altering of ground levels that has taken place on this land amounts to an engineering operation which would require planning permission. If someone was so minded they should contact the Planning Enforcement Team at Ealing to establish if there is currently an enforcement investigation taking place, or if not to ask that the matter be investigated. |